Construction Specifications (CSI)

18 residential CSI MasterFormat divisions. 3-part format, template/parametric/custom specification breakdown, and snag detection.

CSIMasterFormatspecificationsdivisions5 min read

Specification Book โ€” Design Architect Knowledge Base

Structure

~80โ€“100 pages, CSI MasterFormat 3-part format. 18 relevant divisions (of 50 total) for residential.

CSI 3-Part Section Format

Every spec section follows:

  • GENERAL โ€” scope, references, submittals, quality assurance
  • PRODUCTS โ€” materials, manufacturers, performance requirements
  • EXECUTION โ€” preparation, installation, field quality control
  • 18 Residential Divisions

    | Division | Title | Pages | Type | ML Systems Notes | |----------|-------|-------|------|-----------------| | 01 | General Requirements | 6โ€“8 | Template | Project admin, DfD procedures, submittals | | 02 | Existing Conditions | 4โ€“6 | Custom | Demolition, hazmat (lead/asbestos per year built) | | 03 | Concrete | 6โ€“8 | Template | Foundation, grade beams, slab โ€” f'c 4000 PSI | | 04 | Masonry | 2โ€“3 | Parametric | Veneer, recovered brick applications | | 05 | Metals | 8โ€“10 | Template | ML Steel spec โ€” HSLA/AHSS, bolted DfD connections | | 06 | Wood/Plastics/Composites | 6โ€“8 | Parametric | Framing, trusses, finish carpentry | | 07 | Thermal & Moisture | 8โ€“10 | Parametric | Insulation, WRB, air barrier, roofing, flashing | | 08 | Openings | 4โ€“6 | Parametric | Windows (U-factor, SHGC), doors, hardware | | 09 | Finishes | 6โ€“8 | Custom | GWB, paint, tile, flooring, recovered materials | | 10 | Specialties | 1โ€“2 | Parametric | Bath accessories, signage, fire extinguishers | | 12 | Furnishings | 2โ€“3 | Custom | Cabinetry, countertops, window treatments | | 22 | Plumbing | 4โ€“6 | Parametric | Fixtures, piping, water heater, wet wall stack | | 23 | HVAC | 4โ€“6 | Parametric | Mini-split, ducting, controls, IECC compliance | | 26 | Electrical | 4โ€“6 | Parametric | Service, panels, wiring, devices, EV-ready | | 27 | Communications | 2โ€“3 | Parametric | Low voltage, structured wiring, smart home | | 31 | Earthwork | 2โ€“3 | Parametric | Excavation, backfill, compaction | | 32 | Exterior Improvements | 2โ€“3 | Custom | Paving, landscaping, fencing | | 33 | Utilities | 2โ€“3 | Parametric | Site utilities, stormwater |

    Customization Breakdown

    | Type | Pages | % | Description | |------|-------|---|-------------| | Template | ~25 | 31% | ML Steel, foundation, QC, closeout โ€” identical every project | | Parametric | ~45 | 56% | Adapt from curriculum answers (insulation, windows, HVAC) | | Custom | ~10 | 13% | Project-specific (demo scope, finishes, recovered materials) |

    Key Template Specifications (Identical Every Project)

    Division 05 โ€” ML Steel Structure

    • Material: HSLA/AHSS 60โ€“80 ksi yield, recycled automotive sourcing
    • Connections: Bolted end-plate moment (A325/A490), NO field welding
    • Surface prep: SSPC-SP6 commercial blast, shop primer + topcoat
    • Erection: Crane-set, 3โ€“5 day residential erection sequence
    • DfD marking: Each member stamped with ML Material ID
    • Special inspections: IBC Ch 17, third-party bolt torque verification

    Division 03 โ€” Concrete (Foundation)

    • f'c: 4,000 PSI at 28 days (grade beams, footings)
    • Slab: 4" reinforced, 6ร—6 W2.0ร—W2.0 WWF, vapor barrier below
    • Grade beams: 12"ร—24" typical, #4 rebar @ 12" o.c.
    • Stub plates: A36 steel, embedded 6" min, 4ร— A325 anchor bolts
    • Radon: Sub-slab depressurization rough-in (RI requirement)
    • Frost depth: 40" minimum (42"โ€“48" recommended)

    Division 01 โ€” DfD Procedures

    • Connection reversibility documentation for every structural joint
    • Material ID tracking (ML provenance system)
    • Deconstruction sequence plan included in project close-out
    • Recovery value estimate for each major assembly

    Spec Sections Triggered by Curriculum Answers

    Step 2: Year Built Triggers

    | Year Built | Spec Sections Triggered | |------------|------------------------| | Pre-1940 | 02 82 00 Asbestos abatement, 02 83 00 Lead abatement, old-growth recovery protocol | | 1940โ€“1977 | 02 83 00 Lead paint abatement (RI lead law ยง23-24.6) | | 1978โ€“2000 | Standard demolition (02 41 00) | | Post-2000 | Standard demolition, minimal hazmat |

    Step 5: Envelope Selections

    | Selection | Spec Sections | |-----------|---------------| | Heat pump (mini-split) | 23 81 00 Ductless split systems | | Ducted forced air | 23 31 00 Ductwork, 23 37 00 Diffusers | | Radiant floor | 23 21 00 Hydronic piping | | Fiber cement siding | 07 46 00 Fiber cement siding | | Metal panel | 07 42 00 Metal wall panels | | Cedar shingle | 07 46 23 Wood siding |

    Pain Points / Snag View

    What Snags Are

    Construction "snags" = defects, incomplete work, or non-compliant items found during inspection. The DA tracks snags against specific spec sections so nothing falls through cracks.

    Common Residential Snags by Division

    | Division | Common Snags | Prevention | |----------|-------------|------------| | 03 Concrete | Footing depth below frost line, rebar coverage, anchor bolt placement | Pre-pour inspection checklist | | 05 Steel | Bolt torque not verified, connection misalignment, missing fireproofing | IBC Ch 17 special inspection | | 06 Wood | Truss bracing missing, joist hanger nailing incomplete, wrong lumber grade | Simpson connector schedule | | 07 Envelope | Air barrier gaps at penetrations, missing flashing at windows, insulation voids | Blower door test + IR scan | | 08 Windows | U-factor doesn't match spec, missing egress windows in bedrooms | Window schedule cross-check | | 09 Finishes | GWB not Type X at required locations, paint not covering steel primer | Fire-rated assembly checklist | | 22 Plumbing | Wet wall pipes too close to edge of stud, missing cleanouts | Rough-in inspection | | 23 HVAC | Duct leakage > 4 CFM25/100sf, refrigerant line routing through fire-rated assembly | Duct leakage test | | 26 Electrical | Missing GFCI in wet locations, AFCI not in bedrooms, panel schedule mismatch | Circuit-by-circuit verification |

    ML Systems DfD-Specific Snags

    | Snag | Impact | Detection | |------|--------|-----------| | Field weld on bolted connection | Destroys reversibility โ€” CRITICAL | Visual inspection + NDT | | Missing ML Material ID stamp | Breaks provenance chain | Erection checklist | | Stub plate misaligned with Cycle 2 column grid | Future expansion blocked | Survey + template alignment | | Hurricane tie not bolted (nailed instead) | Can't remove truss cleanly | Connection type audit | | Precast plank grouted to beam (instead of dry-set) | Plank not crane-removable | Bearing detail inspection | | Partition nailed to bottom chord (not clipped) | Truss uplift damage + not removable | Framing inspection |

    Snag Severity Levels

    | Level | Action | Example | |-------|--------|---------| | Critical | Stop work, remediate | Field weld on DfD connection | | Major | Fix before covering | Missing flashing, wrong insulation R-value | | Minor | Fix before CO | Paint touch-up, missing caulk bead | | Observation | Document, owner decides | Cosmetic imperfection, color variance |